Lateral Rehab Market: Continued Growth

As North America’s underground infrastructure ages and deteriorates, system owners look to ways they can get the most bang for their buck when it comes to repairs. Many times, that will lead them to trenchless rehabilitation methods.

Looking at the rehabilitation options, cured-in-place pipe (CIPP), which turns 50 in 2021 is by far the leading trenchless option when looking at improving mainline sewers. Generally speaking, when the system owners look to rehabilitate these runs, they also look to rehabilitate the associated manhole structures. The hope is that the two combined will considerably reduce inflow and infiltration (I/I).

READ MORE…

Contact MaxLiner

Phone:  877.426.5948
Fax:  276.656.0419
Email:  info@maxliner.wpenginepowered.com

MaxLiner USA
450 College Drive
Martinsville, VA 24112

Follow Us

Download the New MaxLiner App

Everything you need in the field to succeed in CIPP relining including Geo Locate for jobs, resin calculator, installation log, estimated cure times and more.